Regarding the maintenance of the wire drawing machine, do we have a comprehensive understanding?
Release time:
2023-08-18 14:04
The maintenance of the wire drawing machine will mainly focus on its two parts, the extrusion host and the traction stretching part, and the winding machine part. The purpose of doing this is mainly to enable everyone to be familiar with the maintenance work of the wire drawing machine and to have a better understanding of the wire drawing machine. Then, let's start with the specific content.
1. Extrusion host and traction stretching part
(1) The lubricating oil level of the gearbox should be checked frequently, and the lubricating oil should be replaced every six months.
(2) For bearings, transmission chains and sprockets, lubricating oil should be added every two weeks for lubrication.
(3) Restarting after shutdown should wait until the temperature in the temperature zone reaches the specified requirements, otherwise the machine will be strained or damaged.
(4) During the operation of the equipment, once an abnormality is found, it should be stopped for inspection immediately.
(5) The filter screen should be replaced and cleaned frequently to prevent clogging.
2. The winder part
(1) After the machinery and equipment have been running for three months, the lubricating oil will be replaced. At the same time, but also to conduct a comprehensive inspection of all the screws, such as loose should be tightened in a timely manner.
(2) The duckbill should be checked frequently. If the bottom of the groove is worn too much, it needs to be replaced.
(3) After the machinery and equipment have been running for six months, it is necessary to fully clean up the dust, especially some gaps.
(4) After the machine and equipment have been in operation for one year, the wear parts, lubricating oil, bearings and electrical components should be checked to see if they need to be replaced.